
Dirt Rider . Net Text Version Home
Pages: 1
How many m3 (cubicmeters) with dirt do I need for a landing ramp?.
(Click here to view the original thread with full colors/images)
Posted by: kimoajaj---------------------
Hi guys!
I`m thinking about building an FMX ramp, don`t consider that as a challenge, the hard part will be the landing ramp.
Does anyone know how much dirt I will need to make one?.
I`m thinking about maybe 4 truck loads with dirt (each load is 8-10 m3) , anyone have a clue?.
I wont spend 350$ on building a ramp if making a landing ramp is impossible moneywise.. .
Wellwell
Posted by: BSWIFT---------------------
Your 40 cM is pretty close might take 50 when all said and done.
Posted by: tnrider---------------------
remember that you will have to compact the dirt - this will translate to something like a 10-20% loss of volume (depending on type of dirt and how hard you compact)
Posted by: YZ165---------------------
Here you go.....
http://www.fmxramps.com/ramps/landing.jpg
Posted by: BSWIFT---------------------
With those dimensions, my estimate is way off. It will be closer to 150-180 cM.
Posted by: YZ165---------------------
Indeed BSWIFT. There's a lot of dirt in a good landing. I prefer to find a natural landing and take the ramp to it......
Posted by: HajiWasAPunk---------------------
where can you buy those ramps from? Or do you guys make them yourself?
Posted by: YZ165---------------------
I made both of mine, but you can buy them from FMX.
http://fmxramps.com/
They'll sell you a complete ramp, plans, or, if you read enough of thier site, you can pretty much figure out how it's done and do it yourself.
Text Version Home
vBulletin Copyright ©2000 - 2009,
Jelsoft Enterprises Limited.
vB Easy Archive Final ©2000 - 2009
- Created by Stefan "Xenon" Kaeser